EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
MartysRV14A
-
Listing of Entries
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (453)
Research
Workshop
- (4)
-
Tent Removal and...
-
Workshop: Island Bench
-
Workshop: Band Saw
-
Workshop
Empennage
- (54)
-
Empennage Fairings
-
Aft Fuselage: Fairings
-
Aft Fuselage: Fairings
-
Aft Fuselage: Fairings
-
Aft Fuselage: Trim...
-
Aft Fuselage:...
-
Aft Fuselage:...
-
Aft Fuselage: Top...
-
Aft Fuselage: Left...
-
Aft Fuselage: Right...
-
Aft Fuselage: Rudder...
-
Aft Fuselage: Skin...
-
Aft Fuselage: Rivet...
-
Aft Fuselage:...
-
Aft Fuselage:...
-
Aft Fuselage:...
-
Aft Fuselage:...
-
Aft Fuselage: Bulkheads
-
Aft Fuselage: Part...
-
Elevator: LE Rolling...
-
Elevator: Pitch Trim...
-
Elevator: Hinge Pin
-
Left Elevator: Final...
-
Left Elevator: Assembly
-
Trim Tab: Initial...
-
Left Elevator:...
-
Left Elevator:...
-
Right Elevator:...
-
Right Elevator:...
-
Right Elevator:...
-
Elevators: Match...
-
Elevator: Initial...
-
Elevator: Parts...
-
Elevator: Rib and...
-
Horiz Stab:...
-
Horiz Stab: Rear...
-
Horiz Stab: Cleco...
-
Horz Stab: Dimpling...
-
Horiz Stab: Cradle...
-
Horiz Stab: Front...
-
Horiz Stab: Match...
-
Rudder: TE Riveting...
-
Rudder: Riveting Skins
-
Rudder: Glue and...
-
Rudder: TE...
-
Rudder: Install Skin...
-
Rudder: TE Prep and...
-
Rudder: Cleco, Match...
-
Rudder: Assembling...
-
Vert Stab: Finish...
-
Vert Stab: Dimpling...
-
Vert Stab: Initial...
-
Vert Stab: Forward Spar
-
Empennage: Inventory
Wings
- (84)
-
Brakes, Wheels, and...
-
Right Wing Finish
-
Right Wing Finish
-
Right Wing Close Out
-
Right Wing Close-Up
-
Right Flap
-
Right Fuel Tank
-
Right Fuel Tank
-
Right Fuel Tank
-
Right Aileron Actuation
-
Right Aileron
-
Right Aileron
-
Right Aileron
-
Right Aileron
-
Right Wing, System...
-
Right Fuel Tank
-
Right Fuel Tank
-
Right Fuel Tank
-
Right Fuel Tank
-
Right Fuel Tank
-
Leading Edge - Right...
-
Leading Edgeing Edge...
-
Leading Edge - Right...
-
Right Wing, Upper...
-
Outboard Skin, Right...
-
Inboard Top Skin,...
-
Right Wing, Rear...
-
14.2 Right Wing Ribs
-
14.1 Right Wing -...
-
13.1. Right Wing -...
-
Wing Tip Lens
-
Wing Close Out Tip
-
Wing Tip
-
Left Wing Closeout
-
Left Wing Closeout
-
Left Wing Closeout
-
Fuel Tank
-
Leading Edge
-
LL Lens
-
Wing Wiring, Tank...
-
18.11 Left Fuel Tank
-
18.9 Left Fuel Tank
-
18.9 Left Fuel Tank
-
18.8 Left Fuel Tank
-
18.7 Left Fuel Tank
-
18.6 Left Fuel Tank
-
18.5 Left Fuel Tank
-
18.4 Left Fuel Tank
-
18.3 Left Fuel Tank
-
18.2 Left Fuel Tank
-
18.1 Left Fuel Tank
-
23.3 Aileron Actuation
-
23.2 Aileron Actuation
-
23.1 Aileron Actuation
-
Fuselage - Placed Order
-
22.3 Left Aileron
-
22.2 Left Aileron
-
22.1 Left Aileron
-
21.5 Left Flap
-
21.4 Left Flap
-
21.3 Left Flap
-
21.2 Flap
-
21.1 Flaps
-
20.1 Bottom Wing Skins
-
19.4 Wing System...
-
19.3 Wing System...
-
19.2 Wing System...
-
19.1 Wing System...
-
17.5 Outboard...
-
17.4 Outboard...
-
17.3 Outboard...
-
17.2L Outboard...
-
17.1L Outboard...
-
16L. Top Wing Skins
-
15.2 Rear Spar
-
15.1 Rear Spar
-
14.3 Wing Rig...
-
14.2 Wing Ribs,...
-
14.1 Wing Ribs
-
13.3 Main Spar Wrap-Up
-
13.2 Nutplate...
-
13.1 J-Channels
-
Delivery and Inventory
-
Kit Order
Fuselage
- (47)
-
Transport Stabilizers
-
Baggage Floor
-
Insulation
-
Fuselage Priming
-
JDAir Canopy Latch
-
37.3 Roll Over...
-
37.2 Roll Over...
-
37.1 Roll Over...
-
Fuselage vents
-
35.3 Upper FWD Fuselage
-
36.4 Fuselage
-
36.3 Fuselage
-
36.2 Elevator Pushrods
-
35.2 Upper Forward...
-
35.1. Upper Fwd...
-
33.4 Rudder, Brakes,...
-
33.3. Rudder Pedal...
-
30.4. Aft Fuse...
-
33.1 Rudder Pedals
-
33.2 Brake System
-
31.2. Fuel System
-
30.3. Aft Fuse...
-
30.2 Aft Fuse...
-
30.1 Aft Fuselage...
-
31.1 Fuel System
-
29.6 FWD Mid...
-
29.5 FWD Mid Fuse...
-
29.3 FWD Mid Fuse
-
29.2 FWD Mid Fuse
-
29.1 FWD Mid Fuse
-
28.3 FWD Fuse...
-
28.2 Firewall...
-
28.1 Forward Bottom...
-
27.3. Tunnel...
-
27.2 Firewall Assembly
-
27.1 Firewall Angles
-
Section 26 Completion
-
Step Attach Assembly
-
Bulkhead to Skin...
-
Rivet Doublers and...
-
Baggage Ribs, Bottom...
-
Bulkhead Assembly
-
Mid-Fuse Lower...
-
Baggage Ribs
-
Forward Mid Fuse...
-
Fuselage Crate Delivery
-
30.1. Aft Fuse...
Avionics
- (31)
-
Autopilot Ground Test
-
Magnetometer...
-
Flaps and Vibration...
-
GMU 22 Bracket
-
ADHS Calibration
-
VOR Antenna
-
Pitch servo
-
Replace EGT
-
Pilot Grip
-
Flap Position Sensor
-
Control Stick issues
-
Brake and Rudder;...
-
Grounding; NAV...
-
Canopy Harness...
-
Canopy, Defrost Fan,...
-
ELT Installation
-
Transponder and COM...
-
GA-57X Antenna Install
-
GA-35 Antenna Install
-
Panel Install continued
-
Panel Install continued
-
Initial Panel Install
-
LRU Installation on...
-
Pilot side LRU install
-
Began installing LRUs
-
Avionics Arrives!
-
Remote Avionics Layout
-
Common harness
-
Common Harness
-
Roll Trim Servo
-
Roll Servo Installation
Engine
- (40)
-
First Engine Start
-
Day Before First...
-
Engine Pre-Oil;...
-
First Electrical...
-
Engine Systems:...
-
Engine Systems:...
-
Engine Systems: Sensors
-
Engine Systems: Sensors
-
Engine Systems: Air...
-
Engine Systems: Air...
-
Engine Systems: Air...
-
Engine Systems:...
-
Engine Systems: P-Mags
-
Engine Systems: Exhaust
-
Engine Systems:...
-
Engine Systems:...
-
Engine Systems:...
-
Engine Systems:...
-
Engine System: Air...
-
Engine Systems:...
-
Engine Systems: Oil...
-
Engine Systems: Heat...
-
Engine Systems: Fuel...
-
Engine Systems: Fuel...
-
Engine Systems: Exhaust
-
Engine Systems: Exhaust
-
Engine Systems
-
Engine Install
-
Engine Prep - Oil Fill
-
Engine Prep -...
-
Various Engine Items
-
Engine Prep
-
Installing Rear...
-
Engine Delivery Update
-
Lycoming Engine...
-
Lycoming Engine...
-
Engine: Lycoming...
-
Engine: Lycoming...
-
Engine: Lycoming...
-
Engine: Lycoming...
Propeller
Firewall Forward
- (41)
-
Firewall penetration...
-
Cowl Pin Covers
-
Ignition Light
-
Tach Cap
-
Sniffle Line
-
Wiring Clean-Up
-
Firewall penetration...
-
A/C install - FWF...
-
Cowling Close Out
-
V-Belt saga ends....
-
Cowling
-
FM-200A Install
-
Oil Cooler Wrap-Up...
-
STATUS AND UPDATE
-
FM-200 Return
-
Oil Access Door
-
Lower Cowling Mods
-
Lower Cowling Mods
-
Lower Cowling Mods
-
Lower Cowling Mods
-
Lower Cowling Mods
-
Lower Cowling Mods
-
Lower Cowling Mods
-
Lower Cowling Mods
-
Induction Air and...
-
Inlet Air Deflectors...
-
Left Side Baffle and AC
-
Fabricating inlet ramp
-
Baffle Mods
-
Baffle Seals
-
Ordered parts
-
Baffling and A/C...
-
Cowling Mod Design,...
-
Lower Cowling Mod...
-
Cowling and A/C
-
Cowling
-
Cowling
-
Cowling
-
Electrical and Cowling
-
29.4. FWD Mid Fuse...
-
Finish Kit Order
Controls
Lighting
- (2)
-
Red/White LED lights
-
Left Wing Landing...
Instrument Panel
- (3)
-
Design Approval
-
Panel Order
-
Panel Design
Fuel System
- (1)
-
Fuel Tank Calibration
Finish
- (63)
-
Koger sunshade
-
Main Gear Fairings
-
Nose Gear Fairing
-
Nose Gear
-
Nose Gear Fairing
-
Nose Gear Fairing
-
Nose Wheel Fairing
-
Nose Wheel Fairing
-
Main Wheel Fairings
-
Wheel Fairings
-
Left Wheel Fairing
-
Relocate Left Wheel...
-
Wing Jack
-
Wheel Fairings
-
Canopy
-
Wing Root Fairings
-
Wing Root Fairings
-
Tail Light
-
Wing Root Fuel Filters
-
Light Check-Out
-
Wing Attachment -...
-
Wing Attachment
-
Interior Install
-
Empennage Fairing -...
-
Empennage Fairing -...
-
Empennage Fairing -...
-
Empennage Fairing -...
-
Mount Tail Feathers
-
Check List Prior to...
-
Flap Motor; A/C;...
-
Cabin Heat Controls
-
Access Panels
-
Misc Finish Items
-
Canopy Completion
-
Rear Canopy and Seat...
-
Wrap-Up
-
Windshield Fariing...
-
Windshield Faring -...
-
Windshield Faring -...
-
Seat Backs
-
Nose Gear
-
Canopy Fairing
-
Canopy and Fairing
-
Canopy Wrap-Up
-
Canopy Painting cont.
-
Canopy painting
-
Canopy Continued
-
Canopy Drilling
-
Canopy Installation
-
Forward Top Skin
-
Canopy and Access...
-
Canopy
-
Engine Mount
-
Main Gear Install
-
Main Landing Gear
-
Various Interior Finish
-
Interior Painting
-
Insulation
-
38.4 Rear Canopy
-
38.3 Canopy Rail...
-
38.2 Canopy Latch
-
38.1 Rear Canopy
-
Finish Kit Delivery
Painting
- (2)
-
Paint Scheme Design...
-
Paint Tent
Inspection
- (3)
-
FAA Airworthiness...
-
FAA Airworthiness...
-
Flight Test Plan
Insurance
- (1)
-
Insurance Quote
Air Cond
- (35)
-
Cooling Test
-
A/C install
-
A/C install
-
A/C install
-
A/C install
-
A/C install
-
A/C install
-
A/C install
-
Evaporator Mock-Up
-
Compressor lubricant...
-
Condenser Vents -...
-
Air Plenum
-
Air Plenum
-
A/C install
-
AC controls
-
A/C install
-
A/C install
-
Plenum and...
-
Plenum, continued
-
Plenum, continued
-
Condenser...
-
Condenser Vents
-
Plenum, continued
-
Condenser Install
-
Plenum, continued
-
Plenum, continued
-
Plenum, continued
-
Supply Plenum
-
Mock-Up, Continued
-
Condenser Mock-Up
-
A/C install - Cabin...
-
V-Belt saga
-
Crimper practice
-
Air Conditioning
-
A/C install
Cowling Mod
Interior
- (1)
-
Interior Close-Out
Transport
- (4)
-
Leaving the Factory!
-
Wing Removal
-
Tow Truck Search
Training
- (2)
-
Transition Training
-
Transition Training
Final Assemb
- (4)
-
Final Assembly - Day 4
-
Final Assembly - Day 3
-
Final Assembly - Day 2
-
Final Assembly - Day 1
Pre-Flight
- (4)
-
Pre-First Flight...
-
Pre-First Flight...
-
Pre-First Flight...
-
Pre-First Flight...
Flight
- (19)
-
Flight Day 10 -...
-
Flight Day 9
-
Flight Day 8
-
Pre-Flight Preparation
-
Flight #8: GTN Practice
-
Flight #7 Pre-Flight
-
Flight #6
-
Flight #6 Pre-Flight
-
Flight 5: Autopilot,...
-
Pre-Flight...
-
Pre-Flight Maintenance
-
Flight 4: Engine...
-
Phase 1 Planning
-
Flight #3: More...
-
Flight #3: Fogged In
-
Flight #2: Engine...
-
Post First-Flight...
-
First Flight
Maintenance
- (7)
-
A/C Leak
-
Canopy Scrath...
-
1st Annual Condition...
-
Right Tank Fuel...
-
Tires
-
Garmin DBs
-
Replace Canopy Seal....
Performance
- (1)
-
Best Glide Speed
Builder Name:
Martin Guinn
-
Project:
Vans - RV-14A
-
VIEW REPORTS
Total Hours:
1990.5
Total Flight Time:
36.1
Total Expense:
N/A
Start/Last Date:
Aug 30, 2019 - Dec 06, 2021
Engine:
Lycoming YIO-390-A3B6 Thunderbolt
Propeller:
Hartzell
Panel:
G3X Touch/GTN 650xi, SteinAir
Friendly URL:
https://eaabuilderslog.org?s=MartysRV14A
Home or Last Project Picture
Jul 30, 2021
Empennage Fairing - Part C
- (3 hours)
Category: Finish
Sanded edges to scribe lines. Reinstalled and noted gaps. Removed, applied packaging tape to vert and horizontal stabilizer, applied flox at gap areas and reinstalled with screws. Cleaned and allowed to harden.
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.